Bypass Bridge
Standard components for special performance.
Works: Cantilever Bridge to complete the By-Pass
Location: Alessandria
Project features: the bridge was built to allow the Alessandria by-pass to overcome the natural barrier of the River Tanaro. To build the cantilever segments cast in-situ with a cast length of 5 m, an ALPI carriage was used built from the standard components of the TAP 2500 and MECCANO 120 systems, which also perfectly responded to the technical needs of the project, being simple to use, highly adaptable and highly technological. In this way, the contractor didn't need to build "special" structures for the project, drastically reducing costs and shortening the construction times.